
Outage exposure
Power interruption remains a tangible household risk across the US.
Source: EIA, 2024 household outage-hours chartA public-research GTM proposal for turning homeowner resilience demand into qualified, installer-ready opportunities in Texas and Florida.
Independent public-research strategy proposal based on publicly available market, product and channel information.
A growing resilience need is meeting a more demanding purchase journey.

Power interruption remains a tangible household risk across the US.
Source: EIA, 2024 household outage-hours chartPurchase decisions increasingly combine resilience value, system economics and long-term service confidence.
Source: IRS Residential Clean Energy Credit
Whole-home systems depend on assessment, configuration, installation and after-sales delivery.
The GTM opportunity sits in converting resilience interest into installer-ready demand.
优先选择停电损失明确、已有能源升级意识,并愿意接受专业安装的家庭用户。
Need Critical loads make outages costly.
Readiness Owns or considers solar, generator, EV charger or home-energy upgrades.
Purchase Will use professional assessment and installation.
Critical loads · runtime · configuration · cost · installer and support.

Lead quality · site fit · configuration · sales efficiency · warranty pathway.

Installer is an existing channel asset that the GTM motion can build around. Source: EcoFlow partner programme.
The offer should help homeowners understand what they need, choose the right configuration and trust the installation outcome.
The growth engine connects homeowner intent, structured qualification and installer capacity into one operating loop.
Whole-home backup, home battery, outage protection and critical loads.
High-energy users and upgrade intent.
Qualified leads, local assets and consultation scripts.
Product proof and resilience education.
A 90-day Texas / Florida pilot tests demand quality, installer capacity, conversion economics and support experience.
Installer availability, service coverage, SLA, inventory and lead routing.
Search, CRM, weather content and assessment completion.
Consultation, site survey, proposal and follow-up.
Commissioning, support burden, satisfaction and referral signal.
This metric connects market demand, installer productivity and real delivery outcomes.